201 MW generation in Brazos, TX · In queue since February 2024 · Proposed COD December 2026
201 MW
Capacity
1
Components
Solar
2y 3m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
2y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
Silver Birch Solar is a proposed 201 MW solar generation project located in Brazos County, Texas. The project, developed by Silver Birch Solar, LLC, is in the ERCOT interconnection queue under queue ID ERCOT-25INR0519, with an entry date of February 2, 2024. The proposed commercial operation date is December 31, 2026, and the project's interconnection status is currently in the Facility Study phase. The point of interconnection is at the Tap 345kV 3400 Twin Oak - 967 Gibbons Creek.
The Silver Birch Solar project has been featured in recent news coverage related to deals.
Generated from interconnection queue and public data sources
State
TX
County
Brazos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Silver Birch Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 3400 Twin Oak - 967 Gibbons Creek
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26