CPS Energy AvR1CT2 Rotor Replacement
23.2 MW generation in Bexar, TX · In queue since October 2023 · Proposed COD March 2026
23.2 MW
Capacity
1
Components
Gas
2y 7m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
2y 5m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-03-28
The CPS Energy AvR1CT2 Rotor Replacement is a proposed 23.2 MW gas-fired generation project located in Bexar County, Texas. Developed by CPS Energy, the project is interconnected within the ERCOT region under queue ID ERCOT-25INR0531, with an interconnection queue entry date of October 13, 2023. The proposed commercial operation date is March 28, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.
The project is linked to the existing CPS Energy Braunig plant at the 5475 Braunig 345kV point of interconnection. Recent news coverage has discussed the project's progress and potential impact on the regional energy grid.
Generated from interconnection queue and public data sources
State
TX
County
Bexar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CPS Energy
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5475 Braunig 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BRA_AVR1_CT2
- POI Substation
- Braunig Switchyard
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about CPS Energy AvR1CT2 Rotor Replacement