Port City Energy Storage (ERCOT-25INR0541) — Project Summary

Queue ID
ERCOT-25INR0541
Capacity
101.2 MW
Technology
Battery
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Port City Energy Storage, LLC
IA Status
Facility Study

Port City Energy Storage

ERCOT-25INR0541BetaActiveBatteryERCOTLBNL

101.2 MW storage in San Patricio, TX · In queue since October 2023 · Proposed COD June 2026

101.2 MW

Capacity

1

Components

Battery

2y 7m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

2y 8m

Facilities Study50%
Queue EntryOct 25, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-15

About

The Port City Energy Storage project is a proposed 101.2 MW battery storage project located in San Patricio County, Texas. Developed by Port City Energy Storage, LLC, the project entered the ERCOT interconnection queue as entry ERCOT-25INR0541 on October 25, 2023. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of June 15, 2026.

The project consists entirely of battery storage, with a total capacity of 101.2 MW. The point of interconnection is Tap 138kV 80258 Mayo4A - 80260 Gila4A. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Port City Energy Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 80258 Mayo4A - 80260 Gila4A

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Port City Energy Storage