Stargazer BESS
104.5 MW storage in Brazoria, TX · In queue since October 2023 · Proposed COD February 2027
104.5 MW
Capacity
1
Components
Battery
2y 7m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-02-01
The Stargazer BESS project is a proposed 104.5 MW battery storage project located in Brazoria County, Texas. Developed by Stargazer Solar LLC, the project entered the ERCOT interconnection queue as entry ERCOT-25INR0556 on October 30, 2023. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of February 1, 2027.
The project consists solely of battery storage, with a total capacity of 104.5 MW. The point of interconnection is the 44010 WA Parish - 42980 Nash 138 kV line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Stargazer Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
44010 WA Parish - 42980 Nash 138 kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Stargazer BESS