Shannon Wind Repower
18.7 MW generation in Archer, TX · In queue since February 2024 · Proposed COD September 2027
18.7 MW
Capacity
1
Components
Wind
2y 3m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
3y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-15
The Shannon Wind Repower is a proposed wind generation project located in Archer County, Texas, with a total capacity of 18.7 MW. Developed by Shannon Wind, LLC, the project consists of 18.7 MW of wind power. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0583, with a queue entry date of February 27, 2024, and a proposed commercial operation date of September 15, 2027. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 1458 Cobb Switching Station at 345 kV.
The proposed project is a generation project and has appeared in recent news coverage regarding renewable energy developments in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Archer
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Shannon Wind, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
1458 Cobb Switching Station 345 kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Fort Cobb
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.