Shannon Wind Repower (ERCOT-25INR0583) — Project Summary

Queue ID
ERCOT-25INR0583
Capacity
18.7 MW
Technology
Wind
Status
active
Location
Archer, TX
Region
ERCOT
Developer
Shannon Wind, LLC
IA Status
Facility Study

Shannon Wind Repower

ERCOT-25INR0583BetaActiveWindERCOTLBNL + Live

18.7 MW generation in Archer, TX · In queue since February 2024 · Proposed COD September 2027

18.7 MW

Capacity

1

Components

Wind

2y 3m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 7m

Facilities Study50%
Queue EntryFeb 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-15

About

The Shannon Wind Repower is a proposed wind generation project located in Archer County, Texas, with a total capacity of 18.7 MW. Developed by Shannon Wind, LLC, the project consists of 18.7 MW of wind power. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0583, with a queue entry date of February 27, 2024, and a proposed commercial operation date of September 15, 2027. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 1458 Cobb Switching Station at 345 kV.

The proposed project is a generation project and has appeared in recent news coverage regarding renewable energy developments in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Archer

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Shannon Wind, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1458 Cobb Switching Station 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Fort Cobb

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.