South Loop Energy Center (ERCOT-25INR0637) — Project Summary

Queue ID
ERCOT-25INR0637
Capacity
161.3 MW
Technology
Battery
Status
active
Location
Bexar, TX
Region
ERCOT
Developer
Concurrent Holdco LLC
IA Status
Facility Study

South Loop Energy Center

ERCOT-25INR0637BetaActiveBatteryERCOTLBNL

161.3 MW storage in Bexar, TX · In queue since May 2024 · Proposed COD May 2028

161.3 MW

Capacity

1

Components

Battery

2 years

In Queue

Facility Study

IA Status

COD target: 2028

Status
Project statusOperationalPOWER Magazine · 2026-01-08
Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryMay 9, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-01

About

The South Loop Energy Center is a proposed 161.3 MW battery storage project located in Bexar County, Texas. Developed by Concurrent Holdco LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-25INR0637. The project entered the interconnection queue on May 9, 2024, and has a proposed commercial operation date of May 1, 2028. Its interconnection status is currently in the Facility Study phase.

The South Loop Energy Center development has been the subject of recent news coverage, with three articles focusing on grid and industry related topics.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bexar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Concurrent Holdco LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345 KV 5400 SPRUCE - 5231 HOWARD

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CALAVER_JKS1
POI Substation
J. K. Spruce Switchyard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about South Loop Energy Center