Bocanova Power II
150.46 MW storage in Brazoria, TX · In queue since October 2024 · Proposed COD June 2026
150.46 MW
Capacity
1
Components
Battery
1y 7m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-06-30
Bocanova Power II is a proposed 150.46 MW battery storage project located in Brazoria County, Texas. The project, developed by Bocanova Power II LLC, is currently in the ERCOT interconnection queue as entry ERCOT-25INR0706, with a queue entry date of October 10, 2024.
The proposed commercial operation date for Bocanova Power II is June 30, 2026. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 39030 TNMP Alvin 138kV.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bocanova Power II LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
39030 TNMP Alvin 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Bocanova Power II