Bocanova Power II (ERCOT-25INR0706) — Project Summary

Queue ID
ERCOT-25INR0706
Capacity
150.46 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Bocanova Power II LLC
IA Status
Facility Study

Bocanova Power II

ERCOT-25INR0706BetaActiveBatteryERCOTLBNL + Live

150.46 MW storage in Brazoria, TX · In queue since October 2024 · Proposed COD June 2026

150.46 MW

Capacity

1

Components

Battery

1y 7m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

1y 8m

Facilities Study50%
Queue EntryOct 10, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-30

About

Bocanova Power II is a proposed 150.46 MW battery storage project located in Brazoria County, Texas. The project, developed by Bocanova Power II LLC, is currently in the ERCOT interconnection queue as entry ERCOT-25INR0706, with a queue entry date of October 10, 2024.

The proposed commercial operation date for Bocanova Power II is June 30, 2026. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 39030 TNMP Alvin 138kV.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bocanova Power II LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

39030 TNMP Alvin 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Bocanova Power II