Poteet BESS (ERCOT-25INR0715) — Project Summary

Queue ID
ERCOT-25INR0715
Capacity
9.95 MW
Technology
Battery
Status
active
Location
Atascosa, TX
Region
ERCOT
Developer
HEN INFRASTRUCTURE, LLC 1
IA Status
In Progress (unknown study)

Poteet BESS

ERCOT-25INR0715BetaActiveBatteryERCOTLBNL

9.95 MW storage in Atascosa, TX · In queue since October 2024 · Proposed COD April 2025

9.95 MW

Capacity

1

Components

Battery

1y 7m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

6 months

Schedule

13 months past proposed COD

In Study38%
Queue EntryOct 17, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-04-01

About

The Poteet BESS project is a proposed 9.95 MW battery storage project located in Atascosa County, Texas. Developed by HEN INFRASTRUCTURE, LLC 1, the project consists entirely of battery storage. It is interconnected within the ERCOT region under queue ID ERCOT-25INR0715, with an interconnection queue entry date of October 17, 2024, and a proposed commercial operation date of April 1, 2025. The interconnection agreement is currently listed as "In Progress (unknown study)".

The proposed project is linked to the existing Poteet operating plant (EIA plant ID 67949). The point of interconnection is at the POTEET SUB station on the 69 kV bus. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Atascosa

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

HEN INFRASTRUCTURE, LLC 1

Utility

Entity

ERCOT

Service Type

Point of Interconnection

TSP Station Name: POTEET SUB TSP Station Code: POTEETS Load Name: POTEE_1 Bus#: 5710 kV: 69

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
POTEET_BESS
POI Substation
Poteet Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Poteet BESS