HyFuels Calhoun Solar (ERCOT-26INR0028) — Project Summary

Queue ID
ERCOT-26INR0028
Capacity
301.82 MW
Technology
Solar
Status
active
Location
Victoria, TX
Region
ERCOT
Developer
HyFuels Green Lake Solar LLC
IA Status
Facility Study

HyFuels Calhoun Solar

ERCOT-26INR0028BetaActiveSolarERCOTLBNL + Live

301.82 MW generation in Victoria, TX · In queue since October 2022 · Proposed COD October 2027

301.82 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5 years

Facilities Study50%
Queue EntryOct 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-01

About

HyFuels Calhoun Solar is a proposed solar generation project located in Victoria County, Texas, within the ERCOT region. The project, developed by HyFuels Green Lake Solar LLC, has a total capacity of 301.82 MW. It consists entirely of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0028, with a queue entry date of October 18, 2022. The proposed commercial operation date is October 1, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 8715 RADIANT7A - 8728 COBRA7A.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Victoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

HyFuels Green Lake Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 8715 RADIANT7A - 8728 COBRA7A

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.