Paluxy Solar (ERCOT-26INR0046) — Project Summary

Queue ID
ERCOT-26INR0046
Capacity
1029.06 MW
Technology
Solar
Status
active
Location
Victoria, TX
Region
ERCOT
Developer
S&S Renewables LLC
IA Status
Facility Study

Paluxy Solar

ERCOT-26INR0046BetaActiveSolarERCOTLBNL

1,029.06 MW generation in Victoria, TX · In queue since January 2023 · Proposed COD June 2027

1,029.06 MW

Capacity

1

Components

Solar

3y 4m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 5m

Facilities Study50%
Queue EntryJan 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-30

About

Paluxy Solar is a proposed solar generation project located in Victoria County, Texas, with a total capacity of 1029.06 MW. Developed by S&S Renewables LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-26INR0046. The project entered the interconnection queue on January 3, 2023, and has a proposed commercial operation date of June 30, 2027. Its interconnection status is currently in the Facility Study phase.

The point of interconnection involves double tapping the 345kV 5915 STP - 5133 Elm Creek ckt#1 and 345kV 5068 Cachena _x0013_ 5323 Old Hickory ckt#2 lines. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Victoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

S&S Renewables LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Double tapping: 345kV 5915 STP - 5133 Elm Creek ckt#1 and 345kV 5068 Cachena _x0013_ 5323 Old Hickory ckt#2

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.