Matias Solar (ERCOT-26INR0076) — Project Summary

Queue ID
ERCOT-26INR0076
Capacity
152.3 MW
Technology
Solar
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
Industrial Bravo Project II LLC
IA Status
Facility Study

Matias Solar

ERCOT-26INR0076BetaActiveSolarERCOTLBNL

152.3 MW generation in Matagorda, TX · In queue since March 2023 · Proposed COD March 2027

152.3 MW

Capacity

1

Components

Solar

3y 2m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryMar 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-03-31

About

The Matias Solar project is a proposed 152.3 MW solar generation facility in Matagorda County, Texas. Developed by Industrial Bravo Project II LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0076, with a queue entry date of March 13, 2023. The proposed commercial operation date is March 31, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The project will interconnect at the 8114 Conoco 138kV point of interconnection. The Matias Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Industrial Bravo Project II LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

8114 Conoco 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Conoco Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Matias Solar