Amerada Solar (ERCOT-26INR0082) — Project Summary

Queue ID
ERCOT-26INR0082
Capacity
301.57 MW
Technology
Solar
Status
active
Location
Freestone, TX
Region
ERCOT
Developer
Amerada Solar, LLC
IA Status
Facility Study

Amerada Solar

ERCOT-26INR0082BetaActiveSolarERCOTLBNL + Live

301.57 MW generation in Freestone, TX · In queue since May 2023 · Proposed COD December 2028

301.57 MW

Capacity

1

Components

Solar

3 years

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-30

About

Amerada Solar is a proposed solar generation project located in Freestone County, Texas, within the ERCOT region. The project, developed by Amerada Solar, LLC, has a total capacity of 301.57 MW. It consists entirely of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0082, with a queue entry date of May 15, 2023, and a proposed commercial operation date of December 30, 2028. Its interconnection status is currently in the Facility Study phase. The project is linked to the existing Amerada operating plant (EIA ID 67649).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Freestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Amerada Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FREC
POI Substation
Richland Chambers Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.