La Salle Solar
503.9 MW generation in La Salle, TX · In queue since April 2023 · Proposed COD July 2027
503.9 MW
Capacity
1
Components
Solar
3y 1m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-07-01
La Salle Solar is a proposed solar generation project located in La Salle County, Texas, within the ERCOT region. The project, developed by OCI La Salle Solar LLC, has a total capacity of 503.9 MW. It is listed in the ERCOT interconnection queue as entry ERCOT-26INR0088, with a queue entry date of April 19, 2023, and a proposed commercial operation date of July 1, 2027. The project's interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing, operating La Salle Solar facility (EIA ID 68354). La Salle Solar has been the subject of recent news coverage, with 13 articles appearing in industry, regulatory, and deals publications.
Generated from interconnection queue and public data sources
State
TX
County
La Salle
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
OCI La Salle Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.