SunWave Solar (ERCOT-26INR0128) — Project Summary

Queue ID
ERCOT-26INR0128
Capacity
159.89 MW
Technology
Solar
Status
active
Location
Nueces, TX
Region
ERCOT
Developer
Buckeye Nueces Bay Solar LLC
IA Status
Facility Study

SunWave Solar

ERCOT-26INR0128BetaActiveSolarERCOTLBNL

159.89 MW generation in Nueces, TX · In queue since May 2023 · Proposed COD June 2028

159.89 MW

Capacity

1

Components

Solar

3 years

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 1m

Facilities Study50%
Queue EntryMay 26, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-30

About

SunWave Solar is a proposed 159.89 MW solar generation project located in Nueces County, Texas. The project, developed by Buckeye Nueces Bay Solar LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0128, with a queue entry date of May 26, 2023. The proposed commercial operation date is June 30, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 159.89 MW of solar photovoltaic generation. It is planned to interconnect at the 8459 Bunsen 138kV point of interconnection. The SunWave Solar project has been mentioned in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Nueces

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Buckeye Nueces Bay Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

8459 Bunsen 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Bunsen Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.