Weathervane Solar SLF
160.49 MW generation in Montague, TX · In queue since August 2023 · Proposed COD December 2026
160.49 MW
Capacity
1
Components
Solar
2y 9m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
The Weathervane Solar SLF project is a proposed solar generation facility with a total capacity of 160.49 MW. It is located in Montague County, Texas, and is being developed by Mallard Place LLC. The project consists of 160.49 MW of solar photovoltaic generation.
The project is currently in the ERCOT interconnection queue as entry ERCOT-26INR0138, with a queue entry date of August 14, 2023. The proposed commercial operation date is December 31, 2026. The project's interconnection agreement status is currently in the Facility Study phase.
Generated from interconnection queue and public data sources
State
TX
County
Montague
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Mallard Place LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV 620 Bowie - 741 Dye Mound
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Weathervane Solar SLF