Seven Springs Solar
145.57 MW generation in Coryell, TX · In queue since September 2023 · Proposed COD May 2028
145.57 MW
Capacity
1
Components
Solar
2y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-26
Seven Springs Solar is a proposed 145.57 MW solar generation project located in Coryell County, Texas. The project, developed by Hancock Springs, LLC, is in the ERCOT interconnection queue as entry ERCOT-26INR0147, with a queue entry date of September 22, 2023. The proposed commercial operation date is May 26, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project consists of 145.57 MW of solar capacity. Seven Springs Solar has been featured in recent news coverage related to the energy industry.
Generated from interconnection queue and public data sources
State
TX
County
Coryell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hancock Springs, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 7061 COPPERAS COVE 7260 Kempner 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Seven Springs Solar