Lazy U Solar 1
252 MW generation in Hardeman, TX · In queue since August 2023 · Proposed COD June 2029
252 MW
Capacity
1
Components
Solar
2y 9m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Lazy U Solar 1 is a proposed solar generation project located in Hardeman County, Texas. The project, with a total capacity of 252 MW, is being developed by Lazy U Solar 1. It is interconnected within the ERCOT region, having entered the interconnection queue as ERCOT-26INR0171 on August 21, 2023. The proposed commercial operation date is June 30, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.
The project is linked to the existing Lazy U Solar 1 operating plant (EIA ID 68357). The point of interconnection is Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Hardeman
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lazy U Solar 1
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
- POI Substation
- Quanah Acme Mills Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.