Lazy U Solar 2 (ERCOT-26INR0172) — Project Summary

Queue ID
ERCOT-26INR0172
Capacity
252 MW
Technology
Solar
Status
active
Location
Hardeman, TX
Region
ERCOT
Developer
Lazy U Solar 2
IA Status
Facility Study

Lazy U Solar 2

ERCOT-26INR0172BetaActiveSolarERCOTLBNL + Live

252 MW generation in Hardeman, TX · In queue since August 2023 · Proposed COD June 2029

252 MW

Capacity

1

Components

Solar

2y 9m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

5y 10m

Facilities Study50%
Queue EntryAug 21, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-30

About

Lazy U Solar 2 is a proposed solar generation project located in Hardeman County, Texas, within the ERCOT region. The development project, with a total capacity of 252 MW, is being developed by Lazy U Solar 2. It consists of 252 MW of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0172, with a queue entry date of August 21, 2023, and a proposed commercial operation date of June 30, 2029. Its interconnection agreement status is currently in the Facility Study phase. The project is linked to the existing Lazy U Solar 2 operating plant (EIA ID 68358).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hardeman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lazy U Solar 2

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A CKT2

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW
POI Substation
Quanah Acme Mills Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Lazy U Solar 2