Lazy U ESS 1 (ERCOT-26INR0173) — Project Summary

Queue ID
ERCOT-26INR0173
Capacity
251.5 MW
Technology
Battery
Status
active
Location
Hardeman, TX
Region
ERCOT
Developer
Lazy U ESS 1
IA Status
Facility Study

Lazy U ESS 1

ERCOT-26INR0173BetaActiveBatteryERCOTLBNL + Live

251.5 MW storage in Hardeman, TX · In queue since September 2023 · Proposed COD June 2029

251.5 MW

Capacity

1

Components

Battery

2y 8m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

5y 9m

Facilities Study50%
Queue EntrySep 8, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-30

About

Lazy U ESS 1 is a proposed battery storage project located in Hardeman County, Texas, within the ERCOT region. The development project, with a total capacity of 251.5 MW, is being developed by Lazy U ESS 1. It consists entirely of battery storage.

The project is listed in the ERCOT interconnection queue as entry 26INR0173, with a queue entry date of September 8, 2023, and a proposed commercial operation date of June 30, 2029. Its interconnection agreement status is currently in the Facility Study phase. The project is linked to the existing Lazy U ESS 1 operating plant (EIA ID 68355).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hardeman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lazy U ESS 1

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW
POI Substation
Quanah Acme Mills Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Lazy U ESS 1