Lazy U ESS 2
251.5 MW storage in Hardeman, TX · In queue since August 2023 · Proposed COD June 2029
251.5 MW
Capacity
1
Components
Battery
2y 9m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Lazy U ESS 2 is a proposed battery storage project located in Hardeman County, Texas, within the ERCOT region. The development project, with a total capacity of 251.5 MW, is sponsored by Lazy U ESS 2. It consists entirely of battery storage.
The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0174, with a queue entry date of August 21, 2023, and a proposed commercial operation date of June 30, 2029. Its interconnection agreement status is currently in the Facility Study phase. The project is linked to the existing Lazy U ESS 2 operating plant (EIA ID 68356).
Generated from interconnection queue and public data sources
State
TX
County
Hardeman
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lazy U ESS 2
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
- POI Substation
- Quanah Acme Mills Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.