Titus Low Carbon Ventures Solar 1
286.84 MW generation in San Patricio, TX · In queue since October 2023 · Proposed COD October 2028
286.84 MW
Capacity
1
Components
Solar
2y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-16
Titus Low Carbon Ventures Solar 1 is a proposed solar generation project located in San Patricio County, Texas, with a total capacity of 286.84 MW. Developed by Vaquero Solar, LLC, the project consists entirely of solar photovoltaic generation. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0211, with a queue entry date of October 13, 2023, and a proposed commercial operation date of October 16, 2028. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection is Tap 345kV 8249 Angstrom - 8624 Grissom. The Titus Low Carbon Ventures Solar 1 project has been mentioned in recent news coverage related to industry, deals, and development.
Generated from interconnection queue and public data sources
State
TX
County
San Patricio
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Vaquero Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 8249 Angstrom - 8624 Grissom
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26