Pamplona Solar
42.38 MW generation in Austin, TX · In queue since August 2023 · Proposed COD October 2028
42.38 MW
Capacity
1
Components
Solar
2y 9m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-17
The Pamplona Solar project is a proposed solar generation facility with a total capacity of 42.38 MW. It is located in Austin County, Texas, and is being developed by Karol Solar III. The project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0229, with a queue entry date of August 14, 2023.
The proposed commercial operation date for Pamplona Solar is October 17, 2028. Its interconnection status is currently in the Facility Study phase. Recent news coverage has discussed the development project.
Generated from interconnection queue and public data sources
State
TX
County
Austin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Karol Solar III
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV 44740 WALLIS_S65_8 - 44700 GEBHRT_X65B8 Ckt#65
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.