Sol Marina Energy Center
175.3 MW generation in Ellis, TX · In queue since October 2023 · Proposed COD October 2027
175.3 MW
Capacity
1
Components
Solar
2y 7m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-29
The Sol Marina Energy Center is a proposed solar generation project located in Ellis County, Texas, with a total capacity of 175.3 MW. Developed by Adapture Solar Development, LLC, the project consists entirely of solar photovoltaic generation. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0241, with a queue entry date of October 25, 2023, and a proposed commercial operation date of October 29, 2027. The project's interconnection status is currently in the Facility Study phase.
The Sol Marina Energy Center has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Ellis
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Adapture Solar Development, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 2427 Watermill - 2466 Big Onion
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Watermill Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.