Jane Storage Energy Center (ERCOT-26INR0247) — Project Summary

Queue ID
ERCOT-26INR0247
Capacity
240.6 MW
Technology
Battery
Status
active
Location
Martin, TX
Region
ERCOT
Developer
NMRE Holdings, LLC
IA Status
Facility Study

Jane Storage Energy Center

ERCOT-26INR0247BetaActiveBatteryERCOTLBNL + Live

240.6 MW storage in Martin, TX · In queue since September 2023 · Proposed COD March 2027

240.6 MW

Capacity

1

Components

Battery

2y 8m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 6m

Facilities Study50%
Queue EntrySep 8, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-03-01

About

The Jane Storage Energy Center is a proposed battery storage project located in Martin County, Texas. Developed by NMRE Holdings, LLC, the project has a total capacity of 240.6 MW. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0247, with a queue entry date of September 8, 2023, and a proposed commercial operation date of March 1, 2027. The project's interconnection agreement status is currently in the Facility Study phase.

The Jane Storage Energy Center has been the subject of recent news coverage, with nine articles appearing in the press. These articles cover topics such as hazards, industry trends, and grid-related issues.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Martin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NMRE Holdings, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

59901 Grelton 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Grelton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Jane Storage Energy Center