Neutron Storage
104.36 MW storage in Mclennan, TX · In queue since September 2023 · Proposed COD April 2028
104.36 MW
Capacity
1
Components
Battery
2y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-29
The Neutron Storage project is a proposed 104.36 MW battery energy storage system located in McLennan County, Texas. The project, developed by Neutron Storage, is interconnected within the ERCOT region and entered the ERCOT interconnection queue as ERCOT-26INR0252 on September 8, 2023. Its proposed commercial operation date is April 29, 2028, and its interconnection agreement status is currently in the Facility Study phase.
The proposed project consists entirely of battery storage, with a total capacity of 104.36 MW. The point of interconnection is the Tap 345kV 13405 Trading House - 68090 Sam Switch. The project is currently listed as active within the ERCOT interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Mclennan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Neutron Storage
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 13405 Trading House - 68090 Sam Switch
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.