Neutron Storage (ERCOT-26INR0252) — Project Summary

Queue ID
ERCOT-26INR0252
Capacity
104.36 MW
Technology
Battery
Status
active
Location
Mclennan, TX
Region
ERCOT
Developer
Neutron Storage
IA Status
Facility Study

Neutron Storage

ERCOT-26INR0252BetaActiveBatteryERCOTLBNL + Live

104.36 MW storage in Mclennan, TX · In queue since September 2023 · Proposed COD April 2028

104.36 MW

Capacity

1

Components

Battery

2y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 7m

Facilities Study50%
Queue EntrySep 8, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-29

About

The Neutron Storage project is a proposed 104.36 MW battery energy storage system located in McLennan County, Texas. The project, developed by Neutron Storage, is interconnected within the ERCOT region and entered the ERCOT interconnection queue as ERCOT-26INR0252 on September 8, 2023. Its proposed commercial operation date is April 29, 2028, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists entirely of battery storage, with a total capacity of 104.36 MW. The point of interconnection is the Tap 345kV 13405 Trading House - 68090 Sam Switch. The project is currently listed as active within the ERCOT interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Mclennan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Neutron Storage

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 13405 Trading House - 68090 Sam Switch

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Neutron Storage