Goldfinch Solar
150.54 MW generation in Van Zandt, TX · In queue since September 2023 · Proposed COD March 2029
150.54 MW
Capacity
1
Components
Solar
2y 8m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-31
Goldfinch Solar is a proposed 150.54 MW solar generation project located in Van Zandt County, Texas. The project, developed by BT DJ4M Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-26INR0253, with a queue entry date of September 22, 2023. The proposed commercial operation date is March 31, 2029. Its interconnection status is currently in the Facility Study phase.
The Goldfinch Solar project has been featured in recent news coverage related to the energy industry. The point of interconnection is the Tap Connection Bus 2485 Poetry Switch _x0013_ 3223 Shamburger Switch.
Generated from interconnection queue and public data sources
State
TX
County
Van Zandt
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BT DJ4M Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap Connection Bus 2485 Poetry Switch _x0013_ 3223 Shamburger Switch
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Goldfinch Solar