Operation Sunshine
602.1 MW generation in Concho, TX · In queue since November 2023 · Proposed COD March 2028
602.1 MW
Capacity
1
Components
Solar
2y 6m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-12
Operation Sunshine is a proposed 602.1 MW solar generation project located in Concho County, Texas. The project, developed by Duck Creek Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0255, with a queue entry date of November 14, 2023. The proposed commercial operation date is March 12, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 602.1 MW of solar generation capacity. Operation Sunshine has been the subject of recent news coverage, with three articles categorized as industry news.
Generated from interconnection queue and public data sources
State
TX
County
Concho
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Duck Creek Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7077 Amos Creek 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.