Camino Ranch Solar 2 SLF (ERCOT-26INR0256) — Project Summary

Queue ID
ERCOT-26INR0256
Capacity
237.21 MW
Technology
Solar
Status
active
Location
Houston, TX
Region
ERCOT
Developer
Camino Ranch Solar Project LLC
IA Status
Facility Study

Camino Ranch Solar 2 SLF

ERCOT-26INR0256BetaActiveSolarERCOTLBNL + Live

237.21 MW generation in Houston, TX · In queue since February 2024 · Proposed COD December 2028

237.21 MW

Capacity

1

Components

Solar

2y 3m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 10m

Facilities Study50%
Queue EntryFeb 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-09

About

The Camino Ranch Solar 2 SLF project is a proposed 237.21 MW solar generation project located in Houston County, Texas. Developed by Camino Ranch Solar Project LLC, the project is in the ERCOT interconnection queue as entry ERCOT-26INR0256, with a queue entry date of February 27, 2024. The proposed commercial operation date is December 9, 2028, and the project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 237.21 MW of solar capacity. Recent news coverage has discussed the Camino Ranch Solar 2 SLF project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Houston

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Camino Ranch Solar Project LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap to Jim English (#3351) _x0013_ Flat Branch (#3345) 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.