Running Iron Solar
204.74 MW generation in Matagorda, TX · In queue since October 2023 · Proposed COD October 2028
204.74 MW
Capacity
1
Components
Solar
2y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-16
Running Iron Solar is a proposed solar generation project located in Matagorda County, Texas, with a total capacity of 204.74 MW. The project, developed by Running Iron Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-26INR0258, with a queue entry date of October 25, 2023. The proposed commercial operation date is October 16, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 204.74 MW of solar photovoltaic generation. The point of interconnection is Tap 138kV Conoco 8138 - Black Cat 80124. The Running Iron Solar project has been mentioned in recent news coverage related to the energy industry and grid development.
Generated from interconnection queue and public data sources
State
TX
County
Matagorda
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Running Iron Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV Conoco 8138 - Black Cat 80124
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Running Iron Solar