SHAWNEE BOTTOM SOLAR (ERCOT-26INR0281) — Project Summary

Queue ID
ERCOT-26INR0281
Capacity
153 MW
Technology
Solar
Status
active
Location
Nacogdoches, TX
Region
ERCOT
Developer
Shawnee Bottom Solar, LLC
IA Status
Facility Study

SHAWNEE BOTTOM SOLAR

ERCOT-26INR0281BetaActiveSolarERCOTLBNL

153 MW generation in Nacogdoches, TX · In queue since September 2023 · Proposed COD June 2026

153 MW

Capacity

1

Components

Solar

2y 8m

In Queue

Facility Study

IA Status

COD target: 2026

Status
as of 3y 6m ago
Project statusApprovedPOWER Magazine · 2022-11-10
Interconnection

Total Duration

2y 9m

Facilities Study50%
Queue EntrySep 22, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-01

About

The Shawnee Bottom Solar project is a proposed 153 MW solar generation facility in Nacogdoches County, Texas. Developed by Shawnee Bottom Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0281, with a queue entry date of September 22, 2023. The proposed commercial operation date is June 1, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 153 MW of solar photovoltaic generation. The point of interconnection is on the tap 138kV 3319 REDLAND_8 - 3120 NACOGDSE_8 transmission line. The Shawnee Bottom Solar project has been mentioned in recent news coverage related to the electric grid.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Nacogdoches

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Shawnee Bottom Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 138kV 3319 REDLAND_8 - 3120 NACOGDSE_8

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about SHAWNEE BOTTOM SOLAR