Cold Creek Solar 2
445.41 MW generation in Schleicher, TX · In queue since December 2023 · Proposed COD May 2028
445.41 MW
Capacity
1
Components
Solar
2y 5m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-28
Cold Creek Solar 2 is a proposed solar generation project located in Schleicher County, Texas, with a total capacity of 445.41 MW. The project, developed by Cold Creek Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-26INR0290, with a queue entry date of December 18, 2023. The proposed commercial operation date is May 28, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection is the Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009). The Cold Creek Solar 2 project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Schleicher
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Cold Creek Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.