Cold Creek Storage 2
174.24 MW storage in Schleicher, TX · In queue since December 2023 · Proposed COD May 2028
174.24 MW
Capacity
1
Components
Battery
2y 5m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-28
Cold Creek Storage 2 is a proposed 174.24 MW battery storage project located in Schleicher County, Texas. The project, developed by Cold Creek Solar LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0291, with a queue entry date of December 4, 2023. The proposed commercial operation date is May 28, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is on the Tap 345kV line between Big Hill (#76003) and Twin Buttes (#76009). The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Schleicher
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Cold Creek Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Cold Creek Storage 2