Firefly Power (ERCOT-26INR0293) — Project Summary

Queue ID
ERCOT-26INR0293
Capacity
401.18 MW
Technology
Battery
Status
active
Location
Tarrant, TX
Region
ERCOT
Developer
Firefly Power LLC
IA Status
Facility Study

Firefly Power

ERCOT-26INR0293BetaActiveBatteryERCOTLBNL

401.18 MW storage in Tarrant, TX · In queue since February 2024 · Proposed COD April 2027

401.18 MW

Capacity

1

Components

Battery

2y 3m

In Queue

Facility Study

IA Status

COD target: 2027

Status
Latest milestone200 MW project cancelled, 400 MW project announced · 2024-12-02constructionreviewonline.com · 2025-10-22
Expected COD2027-12constructionreviewonline.com · 2025-10-22
Interconnection

Total Duration

3y 2m

Facilities Study50%
Queue EntryFeb 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-15

About

Firefly Power is a proposed 401.18 MW battery storage project located in Tarrant County, Texas. The project, developed by Firefly Power LLC, is currently in the ERCOT interconnection queue as entry ERCOT-26INR0293, with a queue entry date of February 27, 2024. The proposed commercial operation date is April 15, 2027, and the project's interconnection status is currently in the Facility Study phase.

The proposed project consists entirely of battery storage with a total capacity of 401.18 MW. The point of interconnection is the 1880 Rocky Creek 345kV. The project has been mentioned in recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Tarrant

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Firefly Power LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1880 Rocky Creek 345kV

Data Source

LBNL

DeveloperVesper Energyconstructionreviewonline.com · 2025-10-22
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Rocky Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-14

View all articles