Bhalu Storage
205.5 MW storage in Howard, TX · In queue since October 2023 · Proposed COD April 2028
205.5 MW
Capacity
1
Components
Battery
2y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-21
Bhalu Storage is a proposed 205.5 MW battery storage project located in Howard County, Texas. Developed by Bhalu Storage, LLC, the project consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-26INR0301, with a queue entry date of October 30, 2023, and a proposed commercial operation date of April 21, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Bhalu operating plant (EIA ID 67652). The point of interconnection is Tap 138kV Bulldog (#23833) _x0013_ Elbow (#23834). The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
TX
County
Howard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bhalu Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV Bulldog (#23833) _x0013_ Elbow (#23834)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- HIGH
- POI Substation
- Salem Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Bhalu Storage