Pleiades Storage (ERCOT-26INR0355) — Project Summary

Queue ID
ERCOT-26INR0355
Capacity
205.5 MW
Technology
Battery
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
Pleiades Storage, LLC
IA Status
Facility Study

Pleiades Storage

ERCOT-26INR0355BetaActiveBatteryERCOTLBNL + Live

205.5 MW storage in Glasscock, TX · In queue since March 2024 · Proposed COD September 2028

205.5 MW

Capacity

1

Components

Battery

2y 2m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-22

About

Pleiades Storage, LLC is proposing a 205.5 MW battery storage project in Glasscock County, Texas. The project, identified as ERCOT-26INR0355 in the ERCOT interconnection queue, entered the queue on March 22, 2024, with a proposed commercial operation date of September 22, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 205.5 MW of battery storage. The point of interconnection is Tap 138kV Einstein 23852 - 10043 St. Lawrence. The project is listed as active in the ERCOT queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pleiades Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV Einstein 23852 - 10043 St. Lawrence

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Pleiades Storage