Pollo Pinto Solar
150.8 MW generation in Palo Pinto, TX · In queue since February 2024 · Proposed COD August 2027
150.8 MW
Capacity
1
Components
Solar
2y 3m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-15
The Pollo Pinto Solar project is a proposed solar generation facility with a total capacity of 150.8 MW. It is located in Palo Pinto County, Texas, and is being developed by TX Palo Pinto SB 6, LLC. The project is interconnected within the Electric Reliability Council of Texas (ERCOT) queue under queue ID ERCOT-26INR0364, with an interconnection queue entry date of February 27, 2024.
The proposed commercial operation date (COD) for Pollo Pinto Solar is August 15, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is Tap 138kV 331 RWMILLER - 320 JAYBIRD. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Palo Pinto
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
TX Palo Pinto SB 6, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 331 RWMILLER - 320 JAYBIRD
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.