Aggie Solar Project SLF
103.7 MW generation in Reeves, TX · In queue since February 2024 · Proposed COD June 2027
103.7 MW
Capacity
1
Components
Solar
2y 3m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-06-30
The Aggie Solar Project SLF is a proposed solar generation project located in Reeves County, Texas, within the ERCOT region. The project, developed by reNRG TX 8 LLC, has a total capacity of 103.7 MW.
The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0388, with a queue entry date of February 2, 2024. The proposed commercial operation date is June 30, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the Coyote Springs Substation 138kV bus.
Generated from interconnection queue and public data sources
State
TX
County
Reeves
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
reNRG TX 8 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
POI: COYOTE SPRINGS SUBSTATION - 138KV BUS NUMBER : 38113 COUNTY : REEVES POI LOCATION: 31.396675, -103.6252777
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Aggie Solar Project SLF