Aggie Solar Project SLF (ERCOT-26INR0388) — Project Summary

Queue ID
ERCOT-26INR0388
Capacity
103.7 MW
Technology
Solar
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
reNRG TX 8 LLC
IA Status
Facility Study

Aggie Solar Project SLF

ERCOT-26INR0388BetaActiveSolarERCOTLBNL + Live

103.7 MW generation in Reeves, TX · In queue since February 2024 · Proposed COD June 2027

103.7 MW

Capacity

1

Components

Solar

2y 3m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 4m

Facilities Study50%
Queue EntryFeb 2, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-30

About

The Aggie Solar Project SLF is a proposed solar generation project located in Reeves County, Texas, within the ERCOT region. The project, developed by reNRG TX 8 LLC, has a total capacity of 103.7 MW.

The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0388, with a queue entry date of February 2, 2024. The proposed commercial operation date is June 30, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the Coyote Springs Substation 138kV bus.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

reNRG TX 8 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

POI: COYOTE SPRINGS SUBSTATION - 138KV BUS NUMBER : 38113 COUNTY : REEVES POI LOCATION: 31.396675, -103.6252777

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Aggie Solar Project SLF