Lucky 7 Solar
100.8 MW generation in Hopkins, TX · In queue since March 2024 · Proposed COD September 2027
100.8 MW
Capacity
1
Components
Solar
2y 2m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-20
Lucky 7 Solar is a proposed 100.8 MW solar generation project located in Hopkins County, Texas. The developer is OCI SOLAR POWER LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0409, with a queue entry date of March 22, 2024, and a proposed commercial operation date of September 20, 2027. Its interconnection status is currently in the Facility Study phase.
The Lucky 7 Solar project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Hopkins
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
OCI SOLAR POWER LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 1697 SULPHUR SPRINGS SWITCH - 2464 CASH SWITCH
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Sulphur Springs Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Lucky 7 Solar