TE Smith Storage 2 (ERCOT-26INR0418) — Project Summary

Queue ID
ERCOT-26INR0418
Capacity
125.36 MW
Technology
Battery
Status
active
Location
Rockwall, TX
Region
ERCOT
Developer
Smith II Battery Storage, LLC
IA Status
Facility Study

TE Smith Storage 2

ERCOT-26INR0418BetaActiveBatteryERCOTLBNL + Live

125.36 MW storage in Rockwall, TX · In queue since April 2024 · Proposed COD August 2027

125.36 MW

Capacity

1

Components

Battery

2y 1m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 4m

Facilities Study50%
Queue EntryApr 15, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-08-16

About

The TE Smith Storage 2 project is a proposed 125.36 MW battery storage project located in Rockwall County, Texas. Developed by Smith II Battery Storage, LLC, the project entered the ERCOT interconnection queue on April 15, 2024, with queue ID ERCOT-26INR0418. The proposed commercial operation date is August 16, 2027.

The project's interconnection status is currently in the Facility Study phase. It is designed as a standalone battery storage facility, with the entire 125.36 MW capacity attributed to battery technology. The point of interconnection is the 2483 Royse 345kV substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Rockwall

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Smith II Battery Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

2483 Royse 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
V2_DGR1_RN
POI Substation
Royse Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.