Diamond Cowboy Storage (ERCOT-26INR0428) — Project Summary

Queue ID
ERCOT-26INR0428
Capacity
103.5 MW
Technology
Battery
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Diamond B Storage, LLC
IA Status
Facility Study

Diamond Cowboy Storage

ERCOT-26INR0428BetaActiveBatteryERCOTLBNL + Live

103.5 MW storage in San Patricio, TX · In queue since April 2024 · Proposed COD October 2028

103.5 MW

Capacity

1

Components

Battery

2y 1m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryApr 15, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-16

About

Diamond Cowboy Storage is a proposed 103.5 MW battery storage project in San Patricio County, Texas. Developed by Diamond B Storage, LLC, the project is located within the ERCOT region and entered the ERCOT interconnection queue as entry 26INR0428 on April 15, 2024. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of October 16, 2028.

The proposed project consists entirely of battery storage, with a total capacity of 103.5 MW. The point of interconnection is the Tap 345kV 8249 Angstrom - 8624 Grissom. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Diamond B Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 8249 Angstrom - 8624 Grissom

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Diamond Cowboy Storage