Sword Solar (ERCOT-26INR0445) — Project Summary

Queue ID
ERCOT-26INR0445
Capacity
137.56 MW
Technology
Solar
Status
active
Location
Starr, TX
Region
ERCOT
Developer
Hidalgo Solar LLC
IA Status
Facility Study

Sword Solar

ERCOT-26INR0445BetaActiveSolarERCOTLBNL + Live

137.56 MW generation in Starr, TX · In queue since March 2024 · Proposed COD February 2029

137.56 MW

Capacity

1

Components

Solar

2y 2m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryMar 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-02-22

About

Sword Solar is a proposed 137.56 MW solar generation project located in Starr County, Texas. The developer is Hidalgo Solar LLC. The project, identified as ERCOT-26INR0445, entered the ERCOT interconnection queue on March 22, 2024, with a proposed commercial operation date of February 22, 2029. Its interconnection status is currently in the Facility Study phase.

The proposed project consists of 137.56 MW of solar photovoltaic generation. The point of interconnection is Tap 138 kV 8394 Liston - 8392 Bates. The project is listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Starr

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hidalgo Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV 8394 Liston - 8392 Bates

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LV5_UNIT1
POI Substation
Liston Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Sword Solar