Cannibal Draw Solar
149.5 MW generation in Glasscock, TX · In queue since July 2024 · Proposed COD April 2028
149.5 MW
Capacity
1
Components
Solar
1y 10m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2028-04-10
Cannibal Draw Solar is a proposed solar generation project located in Glasscock County, Texas, with a total capacity of 149.5 MW. The project, developed by Cannibal Draw Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0452, with a queue entry date of July 1, 2024. The proposed commercial operation date is April 10, 2028, and the Interconnection Agreement has been executed.
The project consists of 149.5 MW of solar photovoltaic generation. The Point of Interconnection (POI) is the Sand_Bluff 345 kV (59902) substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Glasscock
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Cannibal Draw Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Sand_Bluff 345 kV (59902)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Cannibal Draw Solar