Cannibal Draw Solar (ERCOT-26INR0452) — Project Summary

Queue ID
ERCOT-26INR0452
Capacity
149.5 MW
Technology
Solar
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
Cannibal Draw Solar, LLC
IA Status
IA Executed

Cannibal Draw Solar

ERCOT-26INR0452BetaActiveSolarERCOTLBNL + Live

149.5 MW generation in Glasscock, TX · In queue since July 2024 · Proposed COD April 2028

149.5 MW

Capacity

1

Components

Solar

1y 10m

In Queue

IA Executed

IA Status

COD target: 2028

Interconnection

Total Duration

3y 9m

Construction75%
Queue EntryJul 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-04-10

About

Cannibal Draw Solar is a proposed solar generation project located in Glasscock County, Texas, with a total capacity of 149.5 MW. The project, developed by Cannibal Draw Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0452, with a queue entry date of July 1, 2024. The proposed commercial operation date is April 10, 2028, and the Interconnection Agreement has been executed.

The project consists of 149.5 MW of solar photovoltaic generation. The Point of Interconnection (POI) is the Sand_Bluff 345 kV (59902) substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cannibal Draw Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Sand_Bluff 345 kV (59902)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Cannibal Draw Solar