Roxton Solar
116.8 MW generation in Lamar, TX · In queue since November 2024 · Proposed COD February 2028
116.8 MW
Capacity
1
Components
Solar
1y 6m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-02-18
The Roxton Solar project is a proposed 116.8 MW solar generation facility in Lamar County, Texas. The project, developed by Roxton Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0470, with a queue entry date of November 26, 2024. The proposed commercial operation date is February 18, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection for the Roxton Solar project is Tap 138 KV Bois Pump (1835) - Brookston (1833). The project has appeared in recent news coverage regarding solar development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Lamar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Roxton Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 KV Bois Pump (1835) - Brookston (1833)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.