Goldhill Energy Storage
200.58 MW storage in Victoria, TX · In queue since April 2024 · Proposed COD September 2028
200.58 MW
Capacity
1
Components
Battery
2y 1m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-30
Goldhill Energy Storage is a proposed 200.58 MW battery storage project located in Victoria County, Texas. The developer is Goldhill Energy Storage LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0505, with a queue entry date of April 15, 2024, and a proposed commercial operation date of September 30, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 8154 VISTRON4B _x0013_ 8189 TUNGSTEN4A.
Generated from interconnection queue and public data sources
State
TX
County
Victoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Goldhill Energy Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 8154 VISTRON4B _x0013_ 8189 TUNGSTEN4A
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Goldhill Energy Storage