Momentum Bock (ERCOT-26INR0506) — Project Summary

Queue ID
ERCOT-26INR0506
Capacity
125.38 MW
Technology
Battery
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
Momentum Bock, LLC
IA Status
Facility Study

Momentum Bock

ERCOT-26INR0506BetaActiveBatteryERCOTLBNL + Live

125.38 MW storage in Lamar, TX · In queue since September 2024 · Proposed COD April 2028

125.38 MW

Capacity

1

Components

Battery

1y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 7m

Facilities Study50%
Queue EntrySep 4, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-20

About

The Momentum Bock project is a proposed 125.38 MW battery storage project in Lamar County, Texas. Developed by Momentum Bock, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0506, with a queue entry date of September 4, 2024.

The proposed commercial operation date (COD) for the Momentum Bock project is April 20, 2028. Its interconnection status is currently in the Facility Study phase, and the point of interconnection (POI) is the 1771 LAMAR BLOSSOM 138kV substation. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Momentum Bock, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1771 LAMAR BLOSSOM 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.