Los Vientos IB Repower (ERCOT-26INR0507) — Project Summary

Queue ID
ERCOT-26INR0507
Capacity
184.8 MW
Technology
Wind
Status
active
Location
Willacy, TX
Region
ERCOT
Developer
Los Vientos Windpower IB, LLC
IA Status
Facility Study

Los Vientos IB Repower

ERCOT-26INR0507BetaActiveWindERCOTLBNL + Live

184.8 MW generation in Willacy, TX · In queue since July 2024 · Proposed COD March 2029

184.8 MW

Capacity

1

Components

Wind

1y 10m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

4y 8m

Facilities Study50%
Queue EntryJul 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-01

About

The Los Vientos IB Repower is a proposed wind generation project with a total capacity of 184.8 MW. Located in Willacy County, Texas, the project is being developed by Los Vientos Windpower IB, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0507, with a queue entry date of July 22, 2024. The proposed commercial operation date is March 1, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for the project is the #8319 RIOHONDO 138 kV location. Recent news coverage has discussed the development project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Willacy

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Los Vientos Windpower IB, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

#8319 RIOHONDO 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Los Vientos IB Repower