Techne BESS
202.7 MW storage in Bastrop, TX · In queue since September 2024 · Proposed COD December 2026
202.7 MW
Capacity
1
Components
Battery
1y 8m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
2y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
The Techne BESS project is a proposed 202.7 MW battery storage development in Bastrop County, Texas. Developed by Techne BESS, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0514, with a queue entry date of September 10, 2024, and a proposed commercial operation date of December 31, 2026. The project's interconnection access status is currently in the Facility Study phase, and its point of interconnection is the 7560 RED ROCK 138kV substation.
The proposed project has appeared in recent news coverage regarding energy storage developments in the ERCOT region.
Generated from interconnection queue and public data sources
State
TX
County
Bastrop
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Techne BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7560 RED ROCK 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Red Rock Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Techne BESS