Techne BESS (ERCOT-26INR0514) — Project Summary

Queue ID
ERCOT-26INR0514
Capacity
202.7 MW
Technology
Battery
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
Techne BESS, LLC
IA Status
Facility Study

Techne BESS

ERCOT-26INR0514BetaActiveBatteryERCOTLBNL + Live

202.7 MW storage in Bastrop, TX · In queue since September 2024 · Proposed COD December 2026

202.7 MW

Capacity

1

Components

Battery

1y 8m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

2y 3m

Facilities Study50%
Queue EntrySep 10, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

About

The Techne BESS project is a proposed 202.7 MW battery storage development in Bastrop County, Texas. Developed by Techne BESS, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0514, with a queue entry date of September 10, 2024, and a proposed commercial operation date of December 31, 2026. The project's interconnection access status is currently in the Facility Study phase, and its point of interconnection is the 7560 RED ROCK 138kV substation.

The proposed project has appeared in recent news coverage regarding energy storage developments in the ERCOT region.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Techne BESS, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

7560 RED ROCK 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Red Rock Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.