Radian Storage II (ERCOT-26INR0518) — Project Summary

Queue ID
ERCOT-26INR0518
Capacity
320 MW
Technology
Battery
Status
active
Location
Brown, TX
Region
ERCOT
Developer
IP Radian BESS, LLC
IA Status
Facility Study

Radian Storage II

ERCOT-26INR0518BetaActiveBatteryERCOTLBNL

320 MW storage in Brown, TX · In queue since July 2024 · Proposed COD April 2027

320 MW

Capacity

1

Components

Battery

1y 10m

In Queue

Facility Study

IA Status

COD target: 2027

Status
Project statusOperationalPR Newswire · 2023-06-06
Latest milestoneCOD achieved · 2024-09-30Energies Media · 2025-12-03
Interconnection

Total Duration

2y 9m

Facilities Study50%
Queue EntryJul 30, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-02

About

The Radian Storage II project is a proposed 320 MW battery energy storage system located in Brown County, Texas. The project, being developed by IP Radian BESS, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0518, with a queue entry date of July 30, 2024. The proposed commercial operation date is April 2, 2027. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is Tap 1444 Brown Switch 345KV.

The Radian Storage II project has been featured in recent news coverage related to the energy industry and grid infrastructure.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brown

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

IP Radian BESS, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 1444 Brown Switch 345KV

Data Source

LBNL

DeveloperExcelsior Energy CapitalEnergies Media · 2025-12-03
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (2)Beta

Last updated 2026-03-26

View all articles