Mandolin Solar SLF (ERCOT-26INR0527) — Project Summary

Queue ID
ERCOT-26INR0527
Capacity
300 MW
Technology
Solar
Status
active
Location
Starr, TX
Region
ERCOT
Developer
Mission Clean Energy Devco LLC
IA Status
Facility Study

Mandolin Solar SLF

ERCOT-26INR0527BetaActiveSolarERCOTLBNL + Live

300 MW generation in Starr, TX · In queue since July 2024 · Proposed COD June 2029

300 MW

Capacity

1

Components

Solar

1y 10m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryJul 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-15

About

Mandolin Solar SLF is a proposed 300 MW solar generation project located in Starr County, Texas. Developed by Mission Clean Energy Devco LLC, the project consists of 300 MW of solar photovoltaic capacity. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0527, with a queue entry date of July 22, 2024.

The proposed commercial operation date for Mandolin Solar SLF is June 15, 2029. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Del Sol to Cenizo transmission line. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Starr

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mission Clean Energy Devco LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Del Sol (SERIES CAP LINE SIDE) BUS#80307 to Cenizo (CAP LINE SIDE) BUS#80225 Transmission Line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Mandolin Solar SLF