Electric E - West Texas Generation
44.4 MW generation in Loving, TX · In queue since October 2024 · Proposed COD April 2028
44.4 MW
Capacity
1
Components
Gas
1y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-09
Electric E - West Texas Generation is a proposed 44.4 MW natural gas generation project located in Loving County, Texas. The project, developed by Electric E Power Marketing, entered the ERCOT interconnection queue as entry ERCOT-26INR0529 on October 18, 2024. It is currently undergoing a Facility Study, with a proposed commercial operation date of April 9, 2028.
The project consists of 44.4 MW of gas-fired generation. Its point of interconnection is #11166 ENPOD 138kV. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Loving
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Electric E Power Marketing
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#11166 ENPOD 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.